Total Illustrative Economic Value
Modeled revenue value plus redirected capacity value before subtracting the engagement investment.
Enter your information to personalize the analysis, email confirmation, and printed results.
Enter the goal leadership is accountable for, then show how much has already been booked. The calculator will translate the percentage into dollars and compare performance with the selling time that has elapsed.
Choose the revenue window in which slippage, weak deal movement, or lost seller focus would matter most. The calculator will compare the time remaining with your average sales cycle and the recommended engagement duration.
Move the slider to adjust how much of the exposed revenue and lost seller capacity may reasonably be influenced. Balanced is the default.
Meeting the number is the obligation. The stronger question is what leadership must protect, improve, and create to put the team in position to outperform it.
Bridge To Revenue does not promise to erase the entire shortfall during a short engagement. It helps leadership determine what can still be protected, what must change in execution, where seller capacity is being lost, and what pipeline must be created.
Current qualified pipeline multiplied by the entered win rate, before slippage.
Qualified pipeline exposed to the entered 30+ selling-day slippage rate.
Expected revenue represented by the slipping pipeline at the entered win rate.
Shortfall if the entered slippage pattern prevents vulnerable pipeline from contributing inside the selected window.
Slipping pipeline translated into an approximate number of average-size opportunities.
Seller hours spent on weak opportunities during the selected recovery window after the engagement.
The selected capacity influence rate applied to seller time at risk.
Loaded labor cost attached to seller time within the selected recovery window.
A measured portion of expected revenue at risk, adjusted for the selected recovery window.
Loaded economic value of seller hours potentially redirected toward stronger opportunities.
Modeled revenue value plus redirected capacity value before subtracting the engagement investment.
Revenue gap ÷ Current win rateShows the qualified pipeline required at the prospect’s current win rate.Current qualified pipeline ÷ Qualified pipeline neededCompares current qualified pipeline with the amount mathematically required.Revenue gap − (Current qualified pipeline × Win rate)Capped at zero. This is the portion of the annual goal not currently supported by qualified pipeline.Current qualified pipeline × Slippage rateApplies the prospect’s slippage assumption to actual current pipeline.Pipeline likely to slip × Current win rateThis is the revenue base used for the influence estimate—not the entire projected shortfall.Revenue gap − ((Current pipeline − Slipping pipeline) × Win rate)A downside scenario, not a forecast that every slipping opportunity will be lost.Pipeline likely to slip ÷ Average deal sizeA directional opportunity count based on the blended average deal size.(Selling days remaining − Engagement selling days) ÷ Average sales cycle selling daysCapped between 0% and 100%. This is a conservative timing adjustment.Sellers × weak-opportunity hours/week × Effective weeks × Loaded hourly costUses the selected recovery window after subtracting the recommended engagement duration.(Expected revenue at risk × Revenue influence rate × Timing factor) + (Seller-time cost × Capacity influence rate)Combines modeled revenue value and redirected capacity value before the fee.Engagement investment ÷ Expected revenue at riskAlso translated into a fraction of one average deal and loaded seller-hours.